Requirements and Environmental Design for LCD Splicing Wall
Number of views:1914order Release Date:2020-11-26
To ensure the smooth implementation of the LCD splicing wall construction project and the normal operation of the system equipment, the construction of the equipment must meet the following environmental conditions:

1、 Power supply

Considering that the system may encounter special situations where there may be a current surge due to the interruption of power supply, the splicing unit itself has a power protection design to ensure the normal and safe operation of the equipment.

1. The power supply voltage should be stable and reliable, especially to prevent immediate power up after power failure. Therefore, in principle, the power supply of the splicing system must be powered by a corresponding power UPS.

2. The splicing system, image controller, and control PC require in-phase power supply.

3. The system equipment should have good grounding, with a grounding resistance of less than 2 Ω, to ensure that the equipment is not damaged in the event of special conditions such as lightning strikes.

4. The power supply of the system is AC 220V ± 5%; Use a three eye socket with a protective grounding wire; The number of sockets is related to the number of splicing units

2、 Light requirements

1. If the windows in the control room are large, direct sunlight should be avoided and curtains should be used to block the light. The curtains should be dark in color.

2. It is recommended to use recessed tube lights for lighting. The lights should not be directly aimed at the screen direction and should be kept at a distance of 3 meters from the screen to avoid affecting the projection effect.

3、 Air conditioning requirements

1. There should be good temperature control and heat dissipation measures in the maintenance channel behind the splicing screen panel. If it is a central air conditioning system, there should be air conditioning inlet and outlet ports. If there is no central air conditioning system, specialized air conditioning should be added, and the power of the air conditioning system depends on the size of the large screen.

2. The temperature inside the maintenance channel and the temperature in the control room of the splicing curtain wall should be controllable and kept basically the same.

4、 Installation requirements

② The cabinet base is usually in direct contact with the anti-static floor to ensure that the ground can withstand gravity for a long time without deformation.

① The installation ground requires a flat and sturdy surface, strong load-bearing capacity, and is not easily deformed.

5、 Requirements for wiring and trunking

1. If it is a fixed floor such as floor tiles or composite wood flooring, it is required that there is a wiring groove between the signal source (computer RGB signal, video signal) and the control computer to the graphics controller (or projector interface), and the shorter the wiring distance, the better.

2. Weak current cables (RGB, video, network, serial port, mouse and keyboard extension cables, etc.) should be routed separately from strong current cables to avoid signal interference. If using cable trays, it is not possible to share one cable tray, and different cable trays should be used for separate wiring.

3. If it is an anti-static floor, holes should be opened at the wiring outlet to leave cable outlets.

6、 System environment

1. The temperature and humidity of the air conditioner before and after splicing the screen should be adjusted to the same scale to ensure the heat dissipation of the splicing wall and the flatness of the splicing screen

2. The fire sprinkler shall be as far away from the splicing wall as possible, and spray extinguishing agent shall be used.

3. The splicing curtain wall room requires cleanliness and dust prevention.

4. The back of the splicing system is a maintenance channel, and the width of the maintenance channel is generally not less than 0.60 meters

5. Large screen rooms require good temperature and humidity control. The working environment temperature is 0 ℃ -40 ℃, and the relative humidity is 10% -90%. There should be air conditioning behind the spliced curtain wall.

7、 Requirements for decoration and equipment location of operation console (room)

1. The placement of the image controller should be located in the aisle (inside the cabinet) next to or behind the curtain wall, and should be as close as possible to the projection box

2. The control computer should be located as close as possible to the opposite direction of the splicing screen and at a suitable distance from it for debugging, color adjustment, and other operations.

3. The position of the operation control computer should be directly opposite the splicing screen, and it is required that the operator can easily and intuitively see the operation of the splicing screen. If there is a dedicated partitioned operation control room, there should be transparent glass between the operation control room and the large screen display room for easy viewing by the operator.


Contact Us
Address: Building B, Lihao Yongda Technology Park, No.1 Dongfang Avenue, Guangming District, Shenzhen
Phone: 0755-23576861
24-hour service hotline: 139 2371 0018

QR code
CopyRight ? 2017 Shenzhen Jintong Display Technology Co., Ltd. All Right Reserved
展開
  • Tel

  • 075523576861
QR code
赤裸人妻撅起肥白大屁股| 成年女人永久免费观看视频| 国产一级AV又粗又大又| 好紧好大快点舒服使劲| 激情综合婷婷丁香五月| 国产一区二区伦理一级| 一区二区看片| 中文无码AV在线亚洲电影| 777奇米视| 成人午夜在线观看日韩| 人人摸人人操人人爱| 掀开奶罩边吃边摸下娇喘视频 | 丰满少妇高潮嗷嗷叫在线观看| hhhh88国产三区| 欧美乱大交xxxxx潮喷l头像| 人妻少妇看A偷人无码精品视频| 黄色在线观看高清无吗| 香蕉久久国产av一区二区| 亚洲中文字幕无码中文字在线| 亚洲欧美激情精品一区二区| 久久亚洲av成人无码| 国产熟女乱伦| 亚洲无码77777| 国产不卡一区二区精品| 精品国产亚洲一区二区三区| 牛叉b电影av| 污网站在线观看视频| 亚洲精品av无码重口另类 | 亚洲精品一区二区天堂| 黑人Av在线| 老女人一区二区三区视频| 久热re这里精品视频在线6| 蜜臀av在线播放一区二区三区| 国产熟女大屁股喷水91精品| 亚洲国模精品一区二区| 亚洲熟女www一区二区三区| 成人免费网站视频www| 免费无码A片一区二三区| 在线观看亚洲人成网站| 搡老女人老女人老熟女| 国产成人精品无码一区二区三区|